Improved Staff Entrance – Covent Garden

Replace the existing staff door entrance as the door leaf was worn and not working correctly.

Solution

Due to the original door set being a ‘bolt in’ accessory package of the original building envelope system, the removal method had to be considered along with detailing the manufacturing methods of the new door set, so it would sit within the existing system as neatly as possible. All these considerations were taken into account by our surveyor and manufacturing and installation teams.

Result

New entrance and revised electric locking all fitted perfectly within our estimated installation time of 4 hours.

Customer Feedback

“Can you please thank everyone on our behalf for brill job done today, particularly Kev and Jacqui.  Customer is very happy”

Mark Lockwood